- Finished product warehouse equipped with trilateral stacker crane (8 load levels, 10 corridors). Packaging classification and receiving / shipping buildings with annexed offices. Area 6,200 m². Sant Celoni (Barcelona).
- Refurbishment of an acetone recovery building for the Dope-color process. Area 1,500 m². Sant Celoni (Barcelona).







